Material Flow Performance

Usually initiated after the first two steps, the third part of the AS IS analysis is to assemble a material flow performance spreadsheet. The objective is to collect and analyze key SCOR Level Two metrics for each location.

Supply chain metrics for Level Two (noted on metrics template, Tables 4-1a-c) include:

Supplier on-time and in-full

RM inventory days of supply at locations and in transit

Transportation cost, calculated by inbound

Backorder duration

Source lead-time, defined by actual and contractual agreements

Manufacturing Level Two metrics include:

Production schedule attainment or on-time shipment

RM, WIP, FG, and returns inventory days of supply, at locations, and in transit

Transportation cost, calculated by shipments between company locations

Manufacturing lead-time, defined by actual and system setups

Distribution center Level Two metrics include:

Order on-time shipment

RM, Returns, WIP, and FG inventory days of supply at locations and in transit

Transportation cost, calculated by outbound and returns

Backorder duration

Order drop-to-ship lead-time.

In Fowlers' case, the assembly of the freight payment detail and assembly of the material flow performance spreadsheet was homework for the rest of the week. The project team agreed that the workload for everyone would be greater in this phase than the SCORcard.